Date
2011
Category
Connection
Connection building in the museum
A connection building was needed between temporary exhibition galleries and existing mansion where hosts the calligraphy collection of the foundation. It is not only a passage but also a welcome desk (cloakroom, iPad exchange, information etc.), entrance to the exhibition in the mansion and entrance to the restaurant at the upper level.
Construction of the intersection point of several gates for different users (visitors of both buildings, customers of restaurant, museum staff) and the most crowded area of museum took 36 days as promised despite the harsh weather conditions while the museum was still active.
- Design
- Construction (Contractor)